Facility support

Plant/Factory Design, construction, maintenance

Factory maintenance

  • Repair of leaking pipes
    ( Cladding, patching, partial replacement )
  • Repair of leaking tanks, containers, and devices
    ( Cladding, patching, partial replacement )
  • Repair and exchange of worn parts
    ( bearings, screws etc. )
  • Repair of pumps, blowers, belt conveyors
    screw conveyors, paddle, mixers, pelletizers etc.
  • Handrails, stairs, inspection walkways, discharge chimneys
  • Repair and exchange of worn parts
  • Personnel outsourcing contracts for maintenance

Factory maintenance

Fabrication of chemical equipment

  • Agitators (tank), condensers
  • All heat exchangers, electrolytic baths, temperature-controlled water tanks
  • screw conveyors, bucket elevators
  • chain conveyors, other conveyors
  • dry boxes, scrubbers
  • cyclone separators, chutes, ducts
  • grinders, crystallization units, bench-scale plants
  • pilot plants
  • filtered wet dust collectors

Fabrication of chemical equipment

Pipe laying

  • up to 500A
  • Iron, stainless steel
    1. 304 to 316L ( S/10 to S/80 SS)
    2. Teflon-lined pipes
    3. ( Nichias Corporation, Nippon Valqua Industries, Ltd. )
    4. Fuji pipe, PP, PVC, PVDF
  • Approved Water Supply Equipment Business No.919 Sakai city

Pipe laying

Back to Top

Tank fabrication

  • Up to 20M3   tanks [K・H will act as proxy for fire safety and
    Second Class pressure container applications.]
  • Iron, stainless steel, 304 to 316L
    1. Dailite tanks
    2. FRP, Teflon coating
    3. PVC lining
    4. Teflon coating
  • Cradles, ladders, stairs, corridors, fences, barriers etc.

Tank fabrication

Back to Top

Inspection, maintenance and repair of all machine covers

  • Leak inspection of underground piping
  • Inspection of the cladding thickness of containers, pipes and pillars
  • Inspection and repair of pumps, blowers, belt conveyors
  • screw conveyors etc.
  • Contract outsourcing of inspection and maintenance personnel
  • Inspection and maintenance of power station cubicles

Machine work

Back to Top

Machine work

  • General purpose lathe work
  • Drill press work
  • Bending work
  • Milling work
  • Numerical control machining
  • Press work

Machine work

Back to Top

Painting

Painting of buildings, offices and factories
Painting

Back to Top

Electric work

  • Design and construction of control panels
  • Sequences
  • Laying of electric wiring ducts

Electric work

Back to Top

New facility construction and relocation

  • Relocation of existing equipment (tanks, piping, pumps,inspection walkways and other equipment) to new facility
  • Bench-scale plants
  • Pilot plants
  • Civil engineering and construction
  • Design
  • Heating and refrigeration work
  • Heavy loads
Materials used
  • SS400 Stainless steel
  • molding Ferrous casting (SC600+Cr2% etc.)
  • Carpenter
  • SUS 304 to 316L Monel
  • metal Nickel

Back to Top